apple valley family aquatic center

BACKGROUND & PROJECT OVERVIEW

The Apple Valley Family Aquatic Center is the larger of the two public pools found in Apple Valley. The leisure pool, which includes the body slides and diving well, opened in 1999. The lazy river and tube slides were added with money from the 2007 Parks Bond Referendum, and they opened in 2009. The facility is now 25 years old and in need of significant investments to ensure it can be enjoyed for many years to come.

This current project at the Apple Valley Family Aquatic Center includes replacing the pool’s mechanical equipment and filtration system to conserve water; refurbishing slides and other water features; improving the front entrance to streamline the entry process; renaming and retheming the facility; adding more shade structures in and around the pool; enhancing concessions space; and updating the bathhouse—which includes the locker rooms, changing areas, bathrooms, and showers—to make the facility more welcoming, inclusive, and accessible for all our patrons.

The total budget for this project is $8.1 million dollars.

CONSTRUCTION UPDATES

November 2024 Update:

Upgrades to slide finishes.
Upgrades to slide finishes.
Old Filler Tanks Prepped for Removal
Removals for New Trellis and Sunshades
Conduit in Place at Entrance for New Solar Panels

NEW FAMILY AQUATIC CENTER FEATURES:

  • New mechanical and filtration systems that conserve water
  • Additional shade structures in and around the pool
  • Refurbished slides
  • New play features in zero-depth section of leisure pool
  • Updated entrance area to streamline entry process
  • Renovated concessions area to optimize space, efficiency, and customer experience
  • Upgraded locker rooms, changing areas, bathrooms, and showers
  • New facility name and theme

PROJECT TIMELINE

  • Design Phase: May–August 2024
  • Construction Begins: September 2024
  • Open For Use: June 2025

COMMUNITY ENGAGEMENT

Stay up to date on this and all other projects of the 2023 Parks Bond Referendum by visiting www.applevalleymn.gov/ParksProjects.

PROJECT TEAM

JLG Architects and Terra Construction