At the north end of campus lies the baseball diamond, installed in 1990. In 2011 a new scoreboard was added beyond the leftfield wall. A new backstop was built before the start of the 2018 season, expanding the hill seating area and both dugouts. It also included a remodeling of the batting cages and bullpens down the left field line.