26th July 2024, Olympic Village. The North-East façade of the construction site.
18th July 2024, Olympic Village. The North-West façade of the construction site at 9:00 a.m.
10th July 2024, Olympic Village. The East façade of the construction site at 9:34 p.m.
2nd July 2024, Olympic Village. Corner of the construction site between Ripamonti and Lorenzini Streets.
2nd July 2024, Olympic Village. Corner of the construction site between Ripamonti and Lorenzini Streets. The Basilico building and the ex-Squadra Rialzo building.
18th May 2024, Olympic Village. The ex-Squadra Rialzo and C buildings.
18th May 2024, Olympic Village. East Horizontal Connection, first floor.
18th May 2024, Olympic Village. Courtyard between buildings D and F, in the background you can see the building C.
18th May 2024, Olympic Village. Courtyard between buildings D and F, reverse shot.
11th May 2024, Olympic Village. D-E-F buildings, the East façade.
11th May 2024, Olympic Village. Courtyard between buildings B and C, in the background you can see the building E.
11th May 2024, Olympic Village. Below the mezzanine between buildings A and B.
11th May 2024, Olympic Village. The West courtyard between buildings A-B.
11th May 2024, Olympic Village. The mezzanine between buildings A and B.
11th May 2024, Olympic Village. The courtyard between building A and B. Another point of view.
11th May 2024, Olympic Village. The courtyard between building A and B. Photo taken from the West Horizontal Connection.
11th May 2024, Olympic Village. The courtyard between building B and C. Photo taken from the West Horizontal Connection.
11th May 2024, Olympic Village. The fourth floor of the West Horizontal Connection. Parallel convergences in front of Ripamonti Street.
11th May 2024, Olympic Village. The fourth floor of the West Horizontal Connection. Reverse shot.
11th May 2024, Olympic Village. Pincushion wall.
11th May 2024, Olympic Village. Building C, a room somewhere on the fourth floor.
11th May 2024, Olympic Village. I am young, but already very skilled with gypsum board.
11th May 2024, Olympic Village. Building C, another space at the centre of the fourth floor.
11th May 2024, Olympic Village. Ex-Squadra Rialzo and Basilico Buildings, 220-degree view.
7th March 2024, Olympic Village. Reached the top floor. Three months ahead of schedule!
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Part sky and part wood.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Parallel convergences.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Parallel convergences. Reverse shot.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Parallel convergences. From left to right!
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Parallel convergences. Viewpoint toward the north.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. The loft.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Under the loft.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Under the loft.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot.
3rd February 2024, Olympic Village. The two acrobatic carpenters at work on the wooden trusses of the roof of the ex-Squadra Rialzo Building.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Over the top.
3rd February 2024, Olympic Village. The ex-Squadra Rialzo Building, train maintenance depot. Over the top... to the left!
3rd February 2024, Olympic Village. E and F buildings.
3rd February 2024, Olympic Village. A-B-C-D-E-F buildings.
3rd February 2024, Olympic Village. D-E-F buildings.
3rd February 2024, Olympic Village. Buildings D-E-F, eastern side.
3rd February 2024, Olympic Village. Buildings D-E, parallel convergences.
3rd February 2024, Olympic Village. Buildings E-F, parallel convergences.
3rd February 2024, Olympic Village. D-E-F buildings, the East façade.
3rd February 2024, Olympic Village. D-E-F buildings, the East façade, plus the underground parking.
3rd February 2024, Olympic Village. Courtyard between buildings B and C at dusk.
3rd February 2024, Olympic Village. Courtyard between buildings D and F at dusk.
3rd February 2024, Olympic Village. D-E-F buildings, the East façade, at the sunset.
24th June 2023, Olympic Village. The West façade of the construction site. At the right you can see the Basilico building and the ex-Squadra Rialzo building.