Studios & Infrastructure Ireland

Main Studios

1

Main Sound Stages

  • A Stage: 8,000 sq. ft. (includes underground water tank)
  • B Stage: 8,000 sq. ft.
  • C Stage: 3,000 sq. ft.
  • D Stage: 15,000 sq. ft.
  • E Stage: 6,300 sq. ft.
  • H Stage: 20,800 sq. ft.

Ardmore Film Factory

  • F Stage: 23,250 sq. ft.
  • G Stage: 5,800 sq. ft.

Support Infrastructure:

Includes production offices, workshops, costume, hair and make-up and props space, dressing rooms, restaurant and backlot.

2

Main Sound Stages

  • Christmas Tree Stage: 12,600 sq. ft.
  • Box Stage: 14,400 sq. ft.
  • Gasworks Stage: 30,000 sq. ft.
  • Dairy Stage: 6,500 sq. ft.
  • 90,000 sq. ft. of sound stages under construction

National Media Campus

  • B stage: 40,000 sq. ft.
  • C stage: 40,000 sq. ft.

Support Infrastructure

500 acres of pristine rural back lot.

3

Sound Stages

  • A Stage: 30,814 sq. ft.
  • B Stage: 17,685 sq. ft.
  • C Stage: 17,921 sq. ft.
  • D Stage: 32,668 sq. ft.
  • T Stage: 5,042 sq. ft.

Support Infrastructure

4

Sound Stage

  • 30,000 sq. ft. stage with 10m working height
  • Motion Capture Performance Studio

Support Infrastructure

Includes, workshop, hair & makeup, costume, production offices, 6 bay loading dock, on-site parking for up to 66 cars and dedicated ESB substation.

5

Sound Stage

  • A stage: 11,194 sq. ft.
  • B stage: 6996 sq. ft.

Support Infrastructure

Includes parking, offices, construction, props, hair & makeup, wardrobe, green screen, 6.4 acre site

6

Sound Stage

  • Studio A: 6,359 sq. ft.
  • Studio B: 7,402 sq. ft.

Support Infrastructure

3,000 sq. ft. of office production space

Studios in Development

Ashbourne Studios

Facilities

  • Stage 1: 27,000 sq. ft.
  • Stage 2: 27,000 sq. ft.
  • Stage 3: 14,000 sq. ft.
  • Stage 4: 9000 sq. ft.

Support Infrastructure

  • 50,000 sq. ft. of production workshop space

Ashford Studios (National Media Campus)

Sound Stages

  • Stage B: 40,000 sq. ft.
  • Stage C: 40,000 sq. ft.

90,000 sq. ft. of sound stages under construction

Support Infrastructure

526,000 sq. ft. of office and ancillary support

Grange Castle

Facilities

  • 800,000 sq. ft. including 11 sound stages, offices, workshop and ancillary supports
  • 56-acre site

Greystones Media Campus

Sound Stages:

  • 270,000 sq. ft. across 14 sound stages
  • 14 sound stages range from 17,000 sq. ft. to 25,000 sq. ft.

Support Infrastructure

  • 520,000 sq. ft. of office and ancillary mill and support buildings

Tara Studios

Sound Stages

  • Stage 1: 21,000 sq. ft.
  • Stage 2: 21,000 sq. ft.
  • S

Support Infrastructure

96,000 sq. ft. of workshop, office and support space

Water Tanks

*Ardmore Studios | Underground Water Tank

  • Underground tank capacity: 26,829 gallons
  • Underground tank dimensions: 24 ft x 20 ft x 9 ft
  • Underground tank dimensions: 24 ft x 20 ft x 9 ft
  • Camera Pit: 5 ft x 5ft x 5ft

Ashford Studios | Wave Basin

  • Basin depth: 4 ft
  • Up to 85 ft x 85 ft width
  • Integrated gutter to recycle spilled water back into the tank

Team FX | Woodside Water Tank

  • Water tank dimensions: 18 ft x 20.9 ft x 8.86 ft.
  • 5 ft x 5 ft camera viewing panel
  • Fully temperature controlled water